Harbor Medical UCLA, Bio Medical Torrance, California

Boomer Construction provided services to this facility in the capacity of a sub-contractor to the General Contractor.

The scope of work was for Building Foundation and all hardscape. Fine grading, concrete flat work, curb/ gutter, Asphalt roadway, CMU block wall.

The concrete was a decorative top cast finish and the block wall a slump stone. All finishes were of high quality.

Call us at (562) 804-4884 or use our handy contact form to get a proposal underway.